{"id":425,"date":"2017-12-24T12:37:24","date_gmt":"2017-12-24T12:37:24","guid":{"rendered":"http:\/\/www.nisargateam.com\/?p=425"},"modified":"2017-12-25T09:17:35","modified_gmt":"2017-12-25T09:17:35","slug":"raman-board","status":"publish","type":"post","link":"https:\/\/www.nisargateam.com\/raman-board.html","title":{"rendered":"Raman Board"},"content":{"rendered":"

[vc_row][vc_column width=”1\/3″ css=”.vc_custom_1514183413909{margin: 10px !important;padding: 10px !important;background-color: #efefef !important;}”][vc_column_text]Name Of The Project:<\/strong><\/p>\n

Raman Boards<\/p>\n

Location:<\/strong><\/p>\n

Nanjanagudu Industrial Area<\/p>\n

Name Of The Client With Contact Details<\/strong><\/p>\n

Raman Boards Limited ( A Unit Of ABB)<\/p>\n

www.ramanboards.com<\/p>\n

Scope Of The Work:<\/strong><\/p>\n

Part Of The Factory Demolition And Machinery Pit Excavation In Rock.<\/p>\n

Challenges:<\/strong><\/p>\n

Running factory-safety was the first and far most priority- and tight time schedule to complete the demolition work and\u00a0 machinery pit excavation- entire pit rock appears-clients already ordered imported equipment and should be installed at a fixed date with foreign engineer who came from other country to install it- tight time schedule to complete the pit rock excavation work.\u00a0 Completed as per client time lines.[\/vc_column_text][\/vc_column][vc_column width=”2\/3″][vc_masonry_media_grid element_width=”6″ item=”mediaGrid_Default” grid_id=”vc_gid:1514183520085-08a876df-7cbe-7″ include=”430,431,432,433,434,435,436,437,438,439,440,441″][vc_separator][vc_column_text]back to Projects<\/a>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"

[vc_row][vc_column width=”1\/3″ css=”.vc_custom_1514183413909{margin: 10px !important;padding: 10px !important;background-color: #efefef !important;}”][vc_column_text]Name Of The Project: Raman Boards Location: Nanjanagudu Industrial Area Name Of The Client With Contact Details Raman Boards Limited ( A Unit Of ABB) www.ramanboards.com Scope Of The Work: Part Of The Factory Demolition And Machinery Pit Excavation In Rock. Challenges: Running factory-safety was the first … Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":434,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"generate_page_header":""},"categories":[16],"tags":[],"_links":{"self":[{"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/posts\/425"}],"collection":[{"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/comments?post=425"}],"version-history":[{"count":0,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/posts\/425\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/media\/434"}],"wp:attachment":[{"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/media?parent=425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/categories?post=425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nisargateam.com\/wp-json\/wp\/v2\/tags?post=425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}